Electricity & Clean Energy: work and initiatives

Power supply, distribution improvements, rooftop solar and energy efficiency. Read the recorded initiatives, their status and supporting sources.

  1. Recorded as delivered25 kW

    Solar power at Rithala

    A 25 kW rooftop solar installation at a DJB facility in Rithala.

    Sources and references

  2. Ongoing66 kV

    Building the next energy upgrades

    Rooftop solarisation of additional government buildings and a 66 kV substation at Mubarakpur Dabas. The substation item was a foundation-stone event.

    Sources and references

  3. Ongoing2.3 lakh target

    Rooftop-solar support expanded

    Expanded rooftop-solar support in September 2026. The 2.3 lakh rooftop target for March 2027 remains a target.